After several months of doing nothing, I finally got a day to get some work completed. I moved the frame outside and finished cutting all of the miscellaneous bolts from the exhaust hangers off. I scraped, grinded and prepped the back 1/3 of the frame.
I was surprised how clean it actually came. As I stated in a previous blog, I have decided to go with Rustoleum brand paint. I was pleased with how the rust reformer performed in small spots I experimented with this winter, so it became the base for the primer. After about 4 hours, it had turned black and as hard as epoxy so I put on the primer.
So, after a hard day’s work, the back 1/3 of the frame is completed on the outside and ready for the final coat of paint. I will try and get the rest of the frame finished this week and then I will tackle the inside of the tube frame.